Client
ALAF
Service
Repair & Waterproofing
Location
Dar es Salaam, Tanzania
Size
50 m2
ALAF Cooling Tower
The malfunctioning temperature regulation system at one of their major mills caused alarm bells to ring, as it had a significant impact on production. The root cause of this issue was the inadequate water supply from the cooling towers connected to the mill. The supply pipes that fed the cooling tower had developed leaks due to deteriorated concrete. Many contractors recommended a one-week shutdown of the tower to repair the concrete. However, the skilled technical team at Satva successfully resolved the challenges within a few hours, ensuring uninterrupted production.